Pump Fundamentals Blog

Mining | GIW | Case Study | Slurry Pumps | MDX

Case Study: Reducing Downtime at BHP Olympic Dam

The historical pump installed was failing prematurely between 1,600 – 1,800 hours of operation, which resulted in unplanned maintenance shutdowns. BHP...

Read More